Wednesday, 23 September 2009

Chiswick Green Studios

Abode Renovations - Current project
CHISWICK GREEN STUDIOS

On 7th September we started converting this studio flat into a 1 bedroom apartment.
It is located in the beautiful Chiswick Green Studios on Evershed Walk. The building was a bomb making factory during the war and was converted around 1996 into flats.

This project will take under a month and will include;
  • sanding and sealing the maple floor
  • painting the all walls and ceilings throughout
  • building stud wall from MDF to house TV, sound system and sky box
  • building from MDF floor to ceiling wardrobes on bedroom side of stud wall
  • building from MDF extra storage on top of existing wardrobes along entire bedroom wall
  • installing Bose sound system
  • installing wireless controlled Sony Bravia TV
  • fitting new stone flooring in bathroom to match existing
As you can see from the pictures it is a good sized project which will keep us all very busy for 4 weeks.










0 comments:

Post a Comment

Followers